It depends on the size of the build. The more we make, the longer we take:
- Foundation — a one-page site — goes live in 3–5 days.
- Studio — a full small-business site — takes 5–10 days.
- Atelier — a full build — takes 10–14 days.
Those are kickoff-to-launch ranges, and every build moves through the same beats:
- Kickoff — onboarding submitted, your project manager books a 20-minute call.
- First draft — the design lands in your dashboard early in the window.
- Staging review — the full site goes up; you walk through it and leave notes.
- Revisions — your feedback lands on the page. Two rounds are included.
- Launch — you approve, we attach your domain, and the site goes live.
If you have a deadline tighter than your plan’s range, mention it in the wizard’s timeline step and we’ll do our best. Most projects land at the early end when both sides are responsive.